InterTech's Test and Assembly systems maintain 10% target Gauge R&R while reducing leak test and functional test cycle times for increased yields in a wide range of automotive, medical, and industrial products that require extensive testing during assembly.
In this application, GM transmission channel plates are mass flow leak tested and marked at a rate of 90 pph.
|